Westwinds, Calgary, AB

The project was undertaken, in Calgary Alberta, after the installation of foundations. Due to the failure of previous workmanship, we were given the task of correcting and finishing the project. The project consisted of two buildings totaling 45,800 square feet. The ground floor is retail commercial with second floor offices. The buildings consisted of Structural Steel, Concrete Block, and Steel Stud exterior walls with Acrylic Stucco finish.

  • Owner: Dr. Bhuller
  • Budget: $2,700,000.00
  • Duration: 9 Months